Plumbing Hookup; Initial Fill - Bunn nitron 2 Installation & Operating Manual

Table of Contents

Advertisement

PLUMBING HOOKUP

The water connection is located on the rear of the dispenser. A 3/8" (9.52 mm) male flare adapter fitting is
supplied, installed on the rear of the dispenser.
NOTE - Water pipe connections and fixtures directly connected to a potable water supply shall be sized, installed
and maintained in accordance with federal, state and local codes.

INITIAL FILL

CAUTION: The dispenser must be disconnected from the power source throughout the initial fill except when
specified in the instructions.
1. Remove drip tray assembly and splash panel from the dispenser. Replace the drip tray.
2. Connect the water source to the back of the dispenser.
3. Connect dispenser to the power source.
4. The dispenser is equipped with an automatic bath fill circuit. When water is supplied and power is applied,
the water will automatically fill if program switch is OFF and dispense switch is ON.
5. It is okay to turn ON the compressor water bath switch as soon as the bath starts filling.
6. Replace the splash panel and drip tray.
7. It will take several hours to create the ice bank required for full dispenser performance. During this time, some
further trickling from the water bath is expected due to expansion caused by ice bank formation. While the
refrigeration system is creating the ice bank, the dispenser may be readied for use as described in Loading,
Priming and Adjustment.
Water Hook Up
11
54261.0001 090817

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents