Notes On Laying Data Communication Cables; Laying Data Communication Cables - Fronius Galvo 208-240 1.5-1 Operating Instructions Manual

Inverter for grid-connected photovoltaic systems
Hide thumbs Also See for Galvo 208-240 1.5-1:
Table of Contents

Advertisement

Notes on Laying Data Communication Cables

Laying Data Com-
IMPORTANT! Inverters may not be operated with an option card and two broken-out op-
munication Ca-
tion card divisions.
bles
In this case, a corresponding blanking cover (42,0405,2020) is optionally available from
Fronius.
IMPORTANT! If data communication cables are to be used in the inverter, please note the
following points:
-
-
-
-
-
-
-
-
-
20
provide your own conduits for the data communication cables
lay the communication cable in the supplied protective hose
knock out the corresponding opening
clean the knocked out opening
insert the supplied cable bushing into the opening (if both openings have been
knocked out, an additional cable bushing 42,0405,2019 is required)
clip the inverter in the wall bracket
insert the data communication cable through the cable bushing from the back
when swiveling the inverter into place, ensure that the cables are not kinked, trapped,
or damaged in any other way do not form any loops with the data communication ca-
bles
lay data communication cables in the inverter data communication area and connect
to the Solar Net connection sockets "IN" and "OUT,"
insert the termination plugs in the remaining Solar Net connection sockets.

Advertisement

Table of Contents
loading

Table of Contents