Installation Instructions; Specifications And Requirements; Installation; First Power-On - Technogym Bike MED Service Maintenance Manual

Hide thumbs Also See for Bike MED:
Table of Contents

Advertisement

BIKE MED: Service & Maintenance Manual - rev. 1.0

5. INSTALLATION INSTRUCTIONS

5.1.

SPECIFICATIONS AND REQUIREMENTS

For correct machine installation, make sure that:
1. The machine is installed on a level surface that is free of vibrations and has sufficient carrying
capacity for the combined weight of the machine and user.
2. The place of installation is free of dust and sand.
3. The place of installation meets the operating temperature and humidity conditions specified in
paragraph 2.4. "Ambient specifications".
4. The machine is not positioned close to sources of heat, sources of electromagnetic noise
(television sets, electrical motors, antennas, high voltage lines, household appliances, etc...) or
medical equipment.
5. To eliminate any interference with the cardio receiver, no transmitters should be placed less
than 1 meter from the display.
6. The mains voltage must match the value specified on the machine rating plate.
7. The electrical system must be correctly earthed.
8. The wall outlet used should be reserved for the machine and have a rating of at least 50 VA.
9. Position the mains lead of the machine where it will not be underfoot.
5.2.

INSTALLATION

To correctly install the machine, proceed as follows:
1. Ensure that the specifications and requirements for installation have been met (see paragraph
5.1. "Specifications and requirements").
2. Position the machine as specified above, on a level surface that is free of vibrations and has
sufficient carrying capacity for the combined weight of the machine and user.
3. The machine is shipped fully assembled and packed in a carton fixed to a wooden pallet.
4. Connect the mains lead to the power inlet socket on the machine.
5. Place the on/off switch in the "0" position.
6. Plug the mains lead into the wall outlet.
5.3.

FIRST POWER-ON

After completing the installation procedure, the machine is ready for use.
Simply turn the on/off switch from position 0 to position 1, to get on the machine.
On power-up the machine performs a self test of the upper and lower assemblies. At the end of this
the machine goes into standby, awaiting a keyboard command.
To check the correct operation of the machine:
Page 5.1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents