Gas-Side Maintenance; Introduction; Clean The Burners; Clean The Injectors - State Water Heaters SCE 80-115 Installation, User And Service Manual

Hide thumbs Also See for SCE 80-115:
Table of Contents

Advertisement

s
9.4
Gas-side
maintenance
9.4.1
Remember
The burners may be
hot.
9.4.2
9.4.3
9.4.4
Remember
The flue baffles may
be hot.
9.5
Completing
maintenance
Release R.1.0 Uk

Introduction

On the gas side the following steps should be carried out:
1.
Clean the
burners.
2.
Clean the
injectors.
3.
Check flue
baffles.

Clean the burners

1. Disassemble the burners.
2. Carefully remove any dirt present on the burner.
3. Fit the burners.

Clean the injectors

1. Disassemble the injectors.
2. Remove any dirt present in the injectors.
3. Fit the injectors.

Check flue baffles

1. Complete steps
1
to
9
from paragraph
2. Remove the flue baffles from the appliance.
3. Check the flue baffles for the presence of rust and remove, where
necessary.
4. Check the flue baffles for wear and replace the flue baffles, where
necessary.
5. Complete steps
13
to
17
To complete the maintenance you should carry out the following steps:
1. Fill the appliance. See paragraph
2. Put the appliance into operation. See
1.
State advises using Borcoil as it knows what its composition is. Borcoil can be ordered from State.

Gas-side maintenance

'9.3.2 Check
from paragraph
'9.3.2 Check anodes'
'4.2 Filling the
appliance'.
'7.2 Putting into
anodes'.
operation'.
63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents