Starting - Chicago Pneumatic CPC 40 G Instruction Book

Oil-injected rotary screw compressors
Table of Contents

Advertisement

5.3

Starting

Procedure
Step
-
-
-
-
58
For the position of the air outlet valve and the drain connections, see sections
Introduction.
Control panel ES 4000 Std
Action
Switch on the voltage. Check that voltage on LED (7) lights up.
Open the air outlet valve.
Press start button (10) on the control panel. The compressor starts running and the
automatic operation LED (3) lights up. After the start-up cycle, the compressor starts
running loaded.
On water-cooled compressors, regulate the cooling water flow during loaded running to
obtain the most suitable temperature at the outlet of the compressor element, i.e.
between 2 and 7 ˚C (4 and 13 ˚F) above the relevant temperature in the figure below.
For optimum operation, the cooling water outlet temperature must never exceed the
value specified in section Compressor data. Consult your supplier if condensate should
form during frequent unloading periods.
Instruction book
2920 7101 41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents