4.3 Set up
Step2: Click Function to enter function
setting.
Step4: Set PV capacity.
Bat Error Logs interface displays 10
pieces of the latest fault records of
device, including the name of the fault
and time of error.
Step1: Click setting and enter the
password.
The installation's password is four digits
password: 6666, after four-digits
password is correctly input, you can enter
into the main Setting interface
(administrator permissions).
Step3: Click PV Connection to set PV
data.
Step5: Set PV input number (MPPT
number).
Alpha ESS Co., Ltd.
27
Your Smart Energy