Alpha ESS Storion-SMILE5 Installation Manual page 18

Energy storage system (ess)
Table of Contents

Advertisement

Step17
Close the battery covers and connect the PV MC4 connectors as shown in the
:
diagram (both sides). At the same time connect all the AC, meter communication
cable, ethernet communication cable and then close the cable box cover. The
installation is now complete.
Step18
Open battery housing case and remove DIP baffle, set the DIP switch 2 to
:
"on" mode at the bottom of the module. Then close the DIP baffle and battery
housing case.
Note: Only the farthest battery from inverter need to set DIP.
PV Wiring
DIP operation
Alpha ESS Co., Ltd.
17
Your Smart Energy

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents