Alpha ESS Storion-SMILE5 Installation Manual page 13

Energy storage system (ess)
Table of Contents

Advertisement

Step7
: Lock waterproof connector, plug in the RJ45 plugs on LAN1 and Meter's ends inside
cable box, then plug in RJ45 and cable on the other side of LAN1 and Meter's ends outside
of cable box (leave some length as the other side might need to be connect to router or
meter). At the same time, connect RJ45 into BAT end inside of cable box and leave the
outside end there for now).
Step8: Lock the cable box back cover, leave the power line and communication line
hang on the outside. Follow the diagram, pass the BAT communication line through
the battery communication baffle in Step2 and connect the RJ45 plug. Leave the
device aside.
Network cable connection diagram
Inverter wiring completion diagram
Alpha ESS Co., Ltd.
12
Your Smart Energy
Communication Baffle

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents