Backup Box - Alpha ESS Storion-SMILE5 Installation Manual

Energy storage system (ess)
Table of Contents

Advertisement

SM60A connect(without meter plug) ( if applicable):
Note:
Meter 5, 6 connect the RJ45 3, 6, then RJ45 connect the cable box/super cable box
For AC/Hybrid system, there are two meter needed:
Two meter connect(with meter plug)
2.4.3 Backup box(If Applicable)
Backup box connect:
L
N
GRID
PE
On_Grid_
On_Grid_
PV
meter
meter
Inverter
Inverter
For SMILE5, you must turn on DIP switch 1.
COM
GRID_L1
LOAD_L1
ON_GRID_L1
AC_L1
BAK_L1
GRID_L2
LOAD_L2
ON_GRID_L2
AC_L2
GRID_L3
BAK_L2
ON_GRID_L3
LOAD_L3
AC_L3
GRID_N
BAK_L3
L
ON_GRID_N
LOAD_N
N
AC_N
GRID_PE
BAK_N
ON_GRID_PE
DSP_BackupBox
Alpha ESS Co., Ltd.
21
Your Smart Energy
without meter plug
patch cable
meter patch cable for backup box
LOAD3
LOAD2
LOAD3
LOAD2
L
N
AC
PE
Storion_S5
Storion_S5
L
N
BACK
Meter Port
PE
Bat
.
LOAD1
LOAD1
PV

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents