2.1 Installation Site and Environment
The following sites are not allowed for installation:
-
Sites where the freezing point is reached, like garages, carports or other places.
-
Sites with humidity and condensation over 85%.
-
Sites which are salty and where humid air can penetrate.
-
Flooded areas.
-
Earthquake areas –additional security measures are required here.
-
Sites with ammonia containing environment.
-
Sites that are higher than 2000 meters above the sea level.
-
Sites with explosive atmosphere.
-
Sites with direct sunlight.
-
Sites with extreme change of ambient temperature.
- Wet rooms.
- Sites with highly flammable materials or gases.
- Sites with a potentially explosive atmosphere.

2.2 Installation

Step1
Remove the battery and inverter from the packaging box.
:
Front of battery with lid off
Step2
Open battery housing case and remove communication wiring baffle (each
:
battery has two of these located on both sides). Place it aside and close the housing
case.
Note: The battery front cover should not open exceeding 90 °
Unpacking the inverter and battery
Communication
wiring baffle
Side of the battery with lid off
Alpha ESS Co., Ltd.
9
Your Smart Energy
.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents