Digital Interface
Reference
Designator
SJP1
Buffer onboard reference (REF1004-2.5)
Buffer user supplied reference voltage applied at P1 pin 20.
SJP2
Connect external reference directly to SJP4
Connect buffered external reference to SJP4
SJP3
Connect U3 negative supply to ground
Connect U3 negative supply to –VCC
SJP4
Connect internal reference to REFIN
Connect external reference to REFIN
SJP5
Connect common-mode voltage to VOCM pin of THS4131
W1
Connect +5VD to BVDD
Connect +3.3VD to BVDD
W3
Set power down signal (PD) high
W4
Set frame sync signal (FS) high
W5
Set chip select signal (CS) low
(1)
Factory Installed
3
Digital Interface
The ADS8372EVM is designed for easy interfacing to multiple platforms. Samtec plug and socket
connectors provide a convenient dual row header/socket combination at P1 and P2 to plug into prototype
boards or ribbon cable over to user system boards.
The digital input and output signals for the converter is available at connector P2 on the ADS8372EVM,
see
Table 3
for the connector pinout.
Description
Chip Select
Serial Clock
Reserved
Frame Sync
Reserved
Reserved
Serial Data Out
BUSY
Convert Start
Power down
4
ADS8372EVM
Table 2. Jumper Setting
Description
Table 3. Pinout for Serial Control Connector P2
Signal Name
Connector Pin
CS
P2.1
SCLK
P2.3
N/A
P2.5
FS
P2.7
N/A
P2.9
N/A
P2.11
SDO
P2.13
BUSY
P2.15
CONVST
P2.17
PD
P2.19
Signal Name
Description
P2.2
N/A
Reserved
P2.4
DGND
Ground
P2.6
N/A
Reserved
P2.8
N/A
Reserved
P2.10
N/A
Reserved
P2.12
N/A
Reserved
P2.14
N/A
Reserved
P2.16
N/A
Reserved
P2.18
DGND
Ground
P2.20
N/A
Reserved
www.ti.com
Pins/Pads
1-2
2-3
(1)
Shorted
Open
Open
Shorted
(1)
Shorted
Open
Open
Shorted
Shorted
Open
(1)
Open
Shorted
(1)
Shorted
Open
Open
Shorted
(1)
Shorted
N/A
(1)
Shorted
Open
Open
Shorted
Shorted
N/A
Shorted
N/A
(1)
Shorted
N/A
SLAU160 – July 2005
Need help?
Do you have a question about the ADS8372EVM and is the answer not in the manual?
Questions and answers