Starting The Program - Leica GPS900 Series Technical Reference Manual

Hide thumbs Also See for GPS900 Series:
Table of Contents

Advertisement

32.2
Access
A) starting the program
Working with Stakeout

Starting the Program

Field
Description of Field
Stakeout Job
The job containing the points to be staked.
Job
The active job. Points which are occupied after staking out are stored
in this job. The original points to be staked are not copied to this job.
Coord System
The coordinate system currently attached to the selected Job.
Codelist
No codes are stored in the selected Job.
Stakeout.
CONT (F1)
To accept the screen entries and continue.
CONF (F2)
To configure the program.
DATA (F5)
To view, edit and delete points stored with
the job.
CSYS (F6)
To select a different coordinate system.
GPS900
242

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents