Where the various components are situated (models 20-40)
These pages identify the various parts contained in the heat pump. The picture shows the location of
the various components. The picture shows the E series.
Pos 6 (Emergency operation, E series)
This is what to do:
Set the 3-way valve to the intermediate position by turning the wheel
to the side half a turn. Then turn the large wheel to an intermediate
position. Turn the small wheel back to its original position to return to
normal position again.
Turn the thermostat wheel to the right to manually activate the electric
boiler.
WARNING! Must not be activated during normal operation.
Reset button for overheat protection on the electric boiler.
Resetting the motor cutout on the heat transfer pump.
Pos 5
Pos 9
Pos 2
Reset, motor cutout com-
pressor.
Pos 3
Reset circuit breaker heat
pump.
Pos 8
Reset, motor cutout heat
transfer fluid pump.
Pos 4
Reset circuit breaker
electric water heater.
(Model E20 has one less
circuit breaker.)
Pos 7
Sight glass.