Mount And Cable All Devices; Set Up The Control Processor And Touchpanels For Network Communication; Configure The Control Processor And Touchpanels; Test, And Troubleshoot - Extron electronics IPL Pro S1 User Manual

Ipl pro series control processors
Hide thumbs Also See for IPL Pro S1:
Table of Contents

Advertisement

Mount and Cable All Devices

Mount the unit to a rack or furniture (see
page 10).
Cable devices to the control processor (see
starting on page 11).
Connect power cords and power on all the devices.

Set up the Control Processor and Touchpanels for Network Communication

Connect the PC that you will use for setup, the control processor, and touchpanels to
the same Ethernet subnetwork. For control processor LAN connections, see
LAN/PoE (IP) connectors and LEDs
Start Global Configurator and use the Toolbelt feature of the software to set the IP
address, subnet, gateway IP address, DHCP status, and related settings. See the
flowchart in

Configure the Control Processor and Touchpanels

The most basic steps are outlined below in the recommended order.
NOTE: See the Global Configurator Help file and GUI Designer Help file as needed for
step-by-step instructions and detailed information. The help file for GC includes an
introduction to the software and how to start a project and configuration.
If TouchLink Pro touchpanels will be part of the system, start and use GUI Designer
to design, save, and build the graphical user interface (GUI) layout for the
touchpanels. See the GUI Designer Help file for instructions.
Using GC, create a new GC Professional or GC Plus project and configure the
control processor and other IP Link Pro devices. The configuration tells the control
processor how its ports will function; how to control other products; which touchpanels
to interact with; what to monitor; when to do things; and whom to notify, how, and
under what circumstances.
Configure ports on the control processor.
Set up monitors, schedules, macros, and local variables.
Add touchpanels and set them up:
Save and build the project.
Upload the system configuration to the control processor.

Test, and Troubleshoot

Test the system. See the
of items to check during system troubleshooting.
Make adjustments to wiring or configuration as needed.
Network Communication Setup
Select device drivers and link them to each serial or Ethernet port.
Select settings (serial protocol) as needed.
Upload the GUI configuration to the touchpanels using Global Configurator.
Assign any appropriate functions, monitors, or schedules to the touchpanels
and their buttons.
Troubleshooting
IPL Pro Series • Hardware Features and Installation
Mounting the IPL Pro Series
Rear Panel Features and Connections
on page 14.
on page 8.
section starting on page 23 for an outline
on
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ipl pro s6Ipl pro s3

Table of Contents