A.3 Installation Work

A.3
This section describes precautions and check items for installation work.
A.3.1

Installation work scope

For the installation work scope, refer to "4.1 Installation Preparations."
A.3.2

Unpacking and unit check

Unpack and check this unit as described below.
- During unpacking, pay special care and attention in handling to avoid unnecessary
shock and scratches damaging the appearance.
- Check to ensure that this unit and the accompanying package are not damaged.
- Check to ensure that wiring does not have a short circuit and is not disconnected.
- Check to ensure that the correct screws are included in the package.
A.3.3

Installation conditions

For the installation work scope, refer to "2.1 Installation Conditions."
The installation method may differ depending on the site for the installation. In principle,
the method conforms to the site.
Do not install this unit in the following places:
- Place exposed to direct sunlight or near heating units
- Humid or dusty place
- Place exposing the unit to shock or vibration
- Unstable place, such as a slope, or place with a lot of weight on it
- Place subject to a strong magnetic field or radio waves
- Environment where the unit would be damaged by seawater or corrosive gas
A.3.4

Connecting external cables

For connection instructions, refer to "Chapter 2 Installation and Connection." For cable
specifications, refer to "4.2 Cable and Connector Details." For the connector pin
assignments of the unit, refer to "A.2.3 Interface specifications."