Intake And Exhaust; Installation Space - Fujitsu IP-HE950 Hardware User's Manual

Table of Contents

Advertisement

IP-HE950 Hardware User's Guide
2.1.3

Intake and exhaust

The IP-HE950 is a forced air cooled unit. Take care not to block the intake/exhaust vents. Leave
an adequate amount of space around the vents.
2.1.4

Installation space

Allocate the operation space, cable bundle space, and intake/exhaust space shown as the
hatched areas in the following figure. (The space is always required.)
This installation space doesn't show maintenance area.
Figure 2-2 Space required for an installation
Chapter 2 Installation and Connection
Copyright 2017 FUJITSU LIMITED
21

Advertisement

Table of Contents
loading

Table of Contents