Installation Checklist; What This Chapter Contains; Checklist - ABB ACS880-01 Hardware Manual

0.55 to 250 kw, 0.75 to 350 hp
Hide thumbs Also See for ACS880-01:
Table of Contents

Advertisement

Installation checklist

What this chapter contains

This chapter contains a list for checking the mechanical and electrical installation of
the drive.

Checklist

Check the mechanical and electrical installation of the drive before start-up. Go
through the checklist together with another person.
WARNING! Only qualified electricians are allowed to carry out the work
described below. Follow the complete safety instructions of the drive. Ignoring
the safety instructions can cause injury or death. Open the main disconnector of the
drive and lock it to open position. Measure to ensure that the drive is not powered.
Check that ...
The ambient operating conditions meet the specification in chapter
If the drive will be connected to an IT (ungrounded) supply network: Optional EMC
filters of type +E200 and +E202 have been disconnected. Consult ABB for the
instructions.
If the drive has been stored over one year: The electrolytic DC capacitors in the DC
link of the drive have been reformed. See page
There is an adequately sized protective earth (ground) conductor between the drive
and the switchboard.
Installation checklist 127
7
Technical
146
data.

Advertisement

Table of Contents
loading

Table of Contents