Installing And Commissioning The Cp 1543-1 - Siemens S7-1500 Operating Instructions Manual

Simatic net
Hide thumbs Also See for S7-1500:
Table of Contents

Advertisement

Installation, connecting up, commissioning, operation

3.2 Installing and commissioning the CP 1543-1

3.2
Installing and commissioning the CP 1543-1
Installation and commissioning
Read the system manual "S7-1500 Automation System"
Prior to installation, connecting up and commissioning, read the relevant sections in the
system manual "S7-1500 Automation System" (references to documentation, refer to the
section Guide to the documentation (Page 9)).
Make sure that the power supply is turned off when installing/uninstalling the devices.
Configuration
Commissioning the CP fully is only possible if the STEP 7 project data is complete.
Procedure for installation and commissioning
Step
Execution
1
When installing and connecting up, keep to
the procedures described for installing I/O
modules in the system manual "S7-1500 Au-
tomation System".
2
Connect the CP to Industrial Ethernet via the
RJ45 jack.
3
Turn on the power supply.
4
Close the front covers of the module and keep
them closed during operation.
5
The remaining steps in commissioning involve
downloading the STEP 7 project data.
28
WARNING
Notes and explanations
Underside of the CP
The STEP 7 project data of the CP is transferred when you
download to the station. To load the station, connect the engi-
neering station on which the project data is located to the
Ethernet interface of the CPU.
You will find more detailed information on loading in the follow-
ing sections of the STEP 7 online help:
"Compiling and loading project data"
"Using online and diagnostics functions"
Operating Instructions, 05/2017, C79000-G8976-C289-07
CP 1543-1