Installing, Connecting Up And Commissioning - Siemens SIMATIC NET TeleControl S7-1200 CP 1243-1 Operating Instructions Manual

Hide thumbs Also See for SIMATIC NET TeleControl S7-1200 CP 1243-1:
Table of Contents

Advertisement

Installation, connecting up, commissioning

3.2 Installing, connecting up and commissioning

3.2
Installing, connecting up and commissioning
Prior to installation and commissioning
Read the system manual "S7-1200 Programmable Controller"
Prior to installation, connecting up and commissioning, read the relevant sections in the
system manual "S7-1200 Programmable Controller", refer to the documentation in the
Appendix.
When installing and connecting up, keep to the procedures described in the system manual
"S7-1200 Programmable Controller".
Pulling/plugging the module
NOTICE
Turning off the station when plugging/pulling the module
Before pulling or plugging the module, always turn off the power supply to the station.
Dimensions for installation
Figure 3-1
Dimensions for installation of the S7-1200
30
CAUTION
Operating Instructions, 12/2016, C79000-G8976-C365-02
CP 1243-1

Advertisement

Table of Contents
loading

Table of Contents