Install the Smart Storage battery.
7.
Route the cable.
8.
Install the fan cage.
9.
Install the air baffle (on page 33).
10.
Install the access panel (on page 28).
11.
Slide the server into the rack.
12.
Connect each power cord to the server.
13.
Connect each power cord to the power source.
14.
Power up the server
15.
FlexibleLOM option
To install the component:
Power down the server (on page 26).
1.
Remove all power:
2.
("Powering up the
server" on page 26).
Hardware options installation 115