Installing The Flush Mount Intake Air Duct Kit - Brocade Communications Systems VDX 8770-4 Hardware Installation Manual

Hide thumbs Also See for VDX 8770-4:
Table of Contents

Advertisement

TABLE 7 Torque requirements
Screw size
6-32 x .25 in. (.635 cm) Phillips screw
10-32 x .63 in.(1.60 cm) Phillips screw

Installing the flush mount Intake Air Duct kit

Use the following procedure to install the flush mount Intake Air Duct kit.
NOTE
After you unpack the kit, check the contents required for this installation against the parts list in
hardware kit is a universal kit, and not all hardware is used for this installation.
Installing the rack hardware
1.
Determine how the device can be oriented in the equipment rack so that the port side has access to intake (cool) air.
NOTE
Be sure to allow for an additional 1U rack space above where you will install the top intake assembly to provide
clearance for raising the intake and inserting it on to side duct tabs. Refer to
2.
Install either clip nuts or retainer nuts depending on whether your rack has round holes or square holes. These allows you to
secure the device to the rack posts.
NOTE
For posts with round holes, use the clip nuts on the rack uprights for securing M6 x 1.0 x 12 screws. For posts with
square holes, use the retainer nuts. Refer to the following figure.
FIGURE 17 Using clip nuts or retainer nuts to secure screws to the rack posts
1.
Clip nuts
2.
Round hole rack rail
3.
Retainer nut
4.
Square hole rack rail
3.
Install the rails on the rack posts, as shown in the following figure.
44
Torque
8.75 in-lb (10 cm-kg)
32 in-lb (36.86 cm-kg)
Step
Mounting the Device
Figure 15
on page 42. This
6.
Brocade VDX 8770-4 Hardware Installation Guide
53-1002563-10

Advertisement

Table of Contents
loading

Table of Contents