HCD-LF1
3-13. LEVER (LOADING R/L)
1
1
spr-T (loading L)
spr-T (loading R)
5 lever (loading R)
2 two hooks
4 two hooks
3 lever (loading L)
PRECAUTION DURING LEVER (LOADING R / L) INSTALLATION
Align the horizontal position.
lever (loading L)
lever (loading R)
Install the both levers so that they move symmetrically.
17