Assembly
Setting up in the boiler room
4.3 Setting up in the boiler room
4.3.1 Remove boiler from pallet
4.3.2 Moving the boiler in the boiler room
Installation Instructions S3 Turbo | M1081217_en
❒ Remove the cardboard with the controller from the boiler and put in a safe place
❒ Lift the cardboard box with the insulation from the pallet
❒ Remove the transport locks
➥ A total of four screws, left/right, front/rear
❒ Lift boiler from pallet
TIP: use Froling's KHV 1400 boiler lifting system to help remove the pallet!
❒ Position a fork-lift or similar lifting device with a suitable load-bearing capacity at
the base frame
❒ Lift and transport to the intended position in the installation room
➥ Observe the minimum distances in the boiler room.
4
25
Need help?
Do you have a question about the S3 Turbo and is the answer not in the manual?