Preparing Your Site - Pinnacle Systems Lightning 1000 Installation Manual

Pinnacle image management system installation guide
Table of Contents

Advertisement

24

Preparing Your Site

When preparing to install your Lightning system, attention should be given
to Environmental, Power and Location requirements.
Environmental Requirements
Lightning is designed to operate in normal "machine room" or
"control room" conditions. Care must also be taken to avoid
temperature and humidity extremes.
Location and Power Requirements
The following table lists power requirements for the Lightning Chassis.
Lightning Chassis P
Lightning Chassis P
Lightning Chassis Po o o o o w w w w w er Requir
Lightning Chassis P
Lightning Chassis P
Parameter
System voltage (NTSC and PAL) . . . . . . 110/220V auto-sensing, 50/60 Hz
Power consumption . . . . . . . . . . . . . . . . . <500 Watts
The following table lists power requirements for the Lightning ShotBox.
Note that power is supplied from a separate supply.
Lightning ShotBo
Lightning ShotBo
Lightning ShotBo
Lightning ShotBox P
Lightning ShotBo
Parameter
System voltage (NTSC and PAL) . . . . . . 110/220V auto-sensing, 50/60 Hz
Power consumption . . . . . . . . . . . . . . . . . <50 Watts
When connecting Lightning, take care to avoid power lines that are
subject to noise and voltage spikes. Do not install the system on a power
circuit that is common to such equipment as air conditioners and refrigera-
tion units. An AC noise filter and surge protector are recommended if
unstable power conditions are present.
Lightning 1000 Installation Guide
er Requir
er Requir
ements
ements
er Requirements
er Requir
ements
ements
Specification
x P
x Po o o o o w w w w w er Requir
x P
er Requir
er Requir
ements
ements
x P
er Requirements
er Requir
ements
ements
Specification

Advertisement

Table of Contents
loading

Table of Contents