Chassis Front Components - Pinnacle Systems Lightning 1000 Installation Manual

Pinnacle image management system installation guide
Table of Contents

Advertisement

12

Chassis Front Components

The figure below illustrates the front of the Lightning chassis.
1
2
4
5
1) Power Switch
4) Power LED
2) Air Vents
5) Disk Drive LED
3) Door
6) CD ROM
1.
Power Switch. Press to turn Lightning on and off.
2.
Air Vents. Lightning's internal components and power supply are
cooled by multiple fans. Air flows through the front vents to the
internal fans. To provide optimum air flow, do not obstruct the
front air vents.
3.
Door. The front door slides to reveal the floppy drive and CD
ROM.
4.
Power LED. The green Power LED lights when the system is on.
5.
Disk Drive LED. The yellow Disk Drive LED lights when there is
hard drive activity.
6.
CD ROM. The CD ROM Drive is provided for loading and
updating software.
7.
Floppy Disk. A standard 3.5" Floppy Disk Drive (1.44 MB) is
provided for offline storage of graphics, transitions, sequences and
layouts.
Lightning 1000 Installation Guide
3
With door closed
6
7
With door open
7) Floppy Disk

Advertisement

Table of Contents
loading

Table of Contents