Maintenance - aerauliqa QR350MBP Installation Manual

Heat recovery ventilation unit
Table of Contents

Advertisement

other side in summer time (table 6.b).
The condensate water is led out through drainage pipe.
Thermistors
Temperature probes to implement temperature dependent functions.

8.3 Maintenance

Make sure that the mains supply to the unit is disconnected before performing any installation, service, maintenance or electrical work!
• Keep the unit surface free from dust.
• Clean the filters every three months with a vacuum cleaner and replace the filters every year. This may differ per situation depending on internal and
external environmental conditions (fig.8 b-c-d-e-f-g).
Fig. 8.b
Fig. 8.d
Fig. 8.f
WARNING
Fig. 8.c
Fig. 8.e
Fig. 8.g
11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the QR350MBP and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Qr400mbpQr550mbp

Table of Contents