5. PRE-INSTALLATION SURVEY

The SEM(U) / IT(U) heating system must
have gas piping of the correct diameter,
length, and arrangement to function properly.
For this reason, a layout drawing is nec-
essary.

6. MOUNTING CLEARANCES

This heater must be mounted and positioned
to maintain the minimum clearance to com-
bustible materials as shown in FIGURE 1
(PAGE 6) TABLE 3 (PAGE 6). For recom-
mended heater placement refer to TABLE 2
(below). Heaters should also be located and
installed with respect to building construction
TABLE 2 RECOMMENDED HEATER PLACEMENT
MODEL
200
SEMU/ITU
175
SEMU/ITU
155
SEMU/ITU
130
SEMU/ITU
110
SEMU/ITU
80
SEMU/ITU
60
SEMU/ITU
IMPORTANT: Continuous operation of single or multi-heater placement must
not cause any combustible material in storage to reach a
temperature in excess of 160
Carefully survey area to be heated, and for
best results, whenever possible, place burner
and combustion chamber in coldest area.
and equipment to provide a minimum clear-
ance of 24 inches from the end of burner
housing for servicing and cleaning of burner,
blower and controls. A minimum horizontal
clearance of 4 ft. from electrical meters, gas
meters, regulators and relief equipment is re-
quired by ANSI Z223.1.& CSA B149.1-00.
MAXIMUM
MOUNTING
DISTANCE
HEIGHTS
BETWEEN
(FEET)
HEATERS
(FEET)
18 – 25
18 – 25
16 – 21
15 – 21
13 – 19
10 – 16
8 – 14
Page 4
DISTANCE-OUTSIDE WALL
TO HEATER LONG AXIS
PARALLEL TO WALL (FEET)
HORIZONTAL
50
17 – 25
50
17 – 25
45
15 – 20
40
15 – 20
35
13 – 18
30
12 – 16
25
11 – 15
O
F.
ANGLE
COMBUSTIBLE
CLEARANCE
GP-MSEM-BX-03B
SEM(U) / IT(U) Manual
RD: Sept, 2005
RL: 03B
KH