Combustion Air Duct - Schwank SEM 200-70 Installation And Owner's Manual

Infrasave sem series, semu series, it series, itu series
Table of Contents

Advertisement

Where the vent pipe passes through areas
where the ambient temperature is likely to
produce condensation of the flue gases, the
vent pipe shall be insulated with a suitable
material as approved and specified by the in-
sulation manufacturer.
FIGURE 18 FLUE VENT CONNECTION
For Direct and Indirect Venting it is recommended to install a length of 'C' Vent onto the
end of the last tube before any fittings are installed. The "C" Vent connection should be
slipped onto the tube and positioned approx 6" beyond the swaged portion of the 4" tube
and must be secured with sheet metal screws.

12. COMBUSTION AIR DUCT

Where heater is operated in a negative air
condition or in contaminated air atmosphere
such as woodworking shops, air for combus-
tion must be ducted from outside to intake
flange on blower. The total maximum com-
bined length of vent and combustion air duct
is 80' for SEM(U) / IT(U) 200, 175, 155 and
Order Optional Parts:
Air Intake Flange:.... Heater Model Reqd.
Air Intake Vent Cap:............JS-0532-VC
Check with the manufacturers Technical Sup-
port as to the maximum vent temperature re-
quirements.
The vent system must always be adequately
supported to prevent sagging.
130, and 50' for SEM(U) / IT(U) 110, 80, 60
and 45. Neither the individual flue vent or
combustion air duct is to exceed 50'. The to-
tal maximum allowable combined vent /air
duct is reduced by ten feet for every 90
elbow installed.
Page 15
FLUE VENT END
OF TUBE
o
vent
GP-MSEM-BX-03B
SEM(U) / IT(U) Manual
RD: Sept, 2005
RL: 03B
KH

Advertisement

Table of Contents
loading

Table of Contents