FIGURE 10 MOUNTING REFLECTOR END CAP
2
1
3
TABLE 4
MODEL
SEM/IT 200-70/60/50
SEM/IT 175-70/60/50
SEM/IT 155-60/50
SEM/IT 155-40
SEMU/ITU 155-30
SEMU/ITU 155-20
SEM/IT 130-50
SEM/IT 130-40
SEM/IT 130-30
SEMU/ITU 130-20
SEMU/ITU 130-15
SEM/IT 110-50
NOTE: Where required the SEMU/ITU Series Heaters will be supplied with the turbulators,
snugly installed into the vent end tube (s) of the system configuration.
FIGURE 11 REFLECTOR ARRANGEMENTS
VENT RUN
(TOP)
TUBES
BURNER MUST
TURBULATOR
LENGTH
(IF REQUIRED)
10'
10'
not required
10'
not required
10'
not required
10'
14'
10'
14'
not required
BE LOWER
1 Reflector End Cap Flange
protruding over and under
the Reflector
2 Screws securing Reflector
to End Cap
3 Opening for Tube
4 Focus Shield Reflector
4
MODEL
SEM/IT 110-40
SEM/IT 110-30
SEMU/ITU 110-20
SEMU/ITU 110-15
SEM/IT
80-40
SEM/IT
80-30
SEM/IT
80-20
SEMU/ITU 80-15
SEMU/ITU 80-10
SEM/IT 60-30
SEM/IT 60-20
SEMU/ITU 60-10
Page 11
TURBULATOR
LENGTH
(IF REQUIRED)
10'
14'
10'
14'
10'
14'
14'
14'
14'
14'
14'
14'
GP-MSEM-BX-03B
SEM(U) / IT(U) Manual
RD: Sept, 2005
RL: 03B
KH