Removal And Replacement Preliminary Requirements; Tools Required; Service Considerations - HP Elite x3 Maintenance And Service Manual

Hide thumbs Also See for Elite x3:
Table of Contents

Advertisement

4
Removal and replacement preliminary
requirements

Tools required

You will need the following tools to complete the removal and replacement procedures:
Phillips 00 screw driver
Two plastic spudger tools
Torx T5 screw driver
Heat protective gloves
Hot plate (heats to 80.0° C (176.0° F))
Stand or way to secure the display
70 percent isopropyl alcohol
2 inch suction cup
0.05 mm thermal conductivity adhesive tape (heat tape)
Grounding tape
Compressed air
Lint- and static-free cloths
NOTE:
contact for additional information.
Glue machine and the glue for that machine
Display panel adhesive alignment fixture
Display kit alignment fixture
Display pressing fixture
Glue Path Golden Sample

Service considerations

The following sections include some of the considerations that you must keep in mind during disassembly
and assembly procedures.
NOTE:
As you remove each subassembly from the device, place the subassembly (and all accompanying
screws) away from the work area to prevent damage.
12
Chapter 4 Removal and replacement preliminary requirements
The following items must be approved for use with the HP Elite X3. Contact your HP service

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents