Pump Down Operation - Daikin CTXG09QVJUW Service Manual

Multi-split type air conditioners 2/3/4mxs-n series
Hide thumbs Also See for CTXG09QVJUW:
Table of Contents

Advertisement

SiUS121630EA

1. Pump Down Operation

Pump Down
In order to protect the environment, be sure to conduct pump down operation when relocating or
disposing the unit.
Operation
1. Remove the valve caps from the liquid stop valve and the gas stop valve.
2. Carry out forced cooling operation.
3. After 5 ~ 10 minutes, close the liquid stop valve with a hexagonal wrench.
4. After 2 ~ 3 minutes, close the gas stop valve and stop the forced cooling operation.
Trial Operation and Field Settings
Gas stop valve
Liquid stop valve
Close
Hexagonal wrench
Valve caps
Pump Down Operation
(R14566)
203

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents