Advertisement

Quick Links

1. ProJet™ 5000 Printer Facility Requirements Guide Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
1.1 01.0 About this Manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
1.2 02.0 What is a Facility Requirements Guide . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
1.3 03.0 Symbols Used in this Guide . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.4 04.0 The ProJet™ Production Printing System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.4.1 04.1 What is Included with a ProJet™ Production Printing System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.5 05.0 Facility Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
1.5.1 05.1 Space Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
1.5.3 05.3 Unit Portability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
1.5.4 05.4 Electrical . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1.5.5 05.5 Client Workstation Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1.5.7 05.7 Material Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
1.5.8 05.8 Material Bottle Disposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.5.9 05.9 Weights and Measures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.6 06.0 Operating Enviroment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.6.1 06.1 Air Conditioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.6.3 06.3 Lighting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1.7 07.0 Preparation for Shipment Arrival . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1.8 08.0 MDM Bottle & Build Platform Installations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1.9 09.0 Limitation of Liability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
1.10 10.0 Thank You . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
1.11 11.0 Contacting 3D Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
1.12 12.0 Printer Advance Preparation Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ProJet 5000 and is the answer not in the manual?

Questions and answers

Summary of Contents for 3D Systems ProJet 5000

  • Page 1: Table Of Contents

    1.11 11.0 Contacting 3D Systems ........
  • Page 2: Projet™ 5000 Printer Facility Requirements Guide Table Of Contents

    01.0 About this Manual This document includes all of the overall facility requirements that will be needed to have a successful installation when our 3D Systems Customer Support Engineers (CSEs) or authorized 3D Systeods representatives arrive to install your 3-D printer.
  • Page 3: Symbols Used In This Guide

    Information on how to obtain assistance from 3D Systems Customer Support Team. 03.0 Symbols Used in this Guide !NOTE.jpg|width=30,height=30! NOTE: The ProJet™ Production Printing System is part of 3D Systems' Multi-Jet-Modeling (MJM) product line. This symbol designates the accompanying texts or figures as either a...
  • Page 4: Facility Guidelines

    This section provides detail relating to site selection, site preparation and readiness of the facility to accept and install the ProJet™ Production Printing System. Discuss the appropriate equipment locations with a 3D Systems' representative, so that the equipment is located in a convenient, appropriate location based on your organization's needs. When planning an installation, consider: 05.1 Space Planning...
  • Page 6: Access Area Surrounding Printers

    At least 36" (908mm) of unobstructed floor space is recommended around each accomodate, to allow unobstructed service access to the drawers, hood and doors. Store crate where it will be easy access to wheel locks or have a jack lift available for the 3D Systems Field Engineers when installation occurs.
  • Page 7: Electrical

    (for designated administrators). Prior to installing the software, ensure that the initially selected workstation meets the following minimum specifications. The specifications described represent 3D Systems tested minimum "baseline" configuration for using the client software. It is recommended that this workstation...
  • Page 8: Network Interface

    The printer works on networks running TCP/IP ONLY each printer MUST have a STATIC IP address on the network. Additionally, each printer's subnet mask and default gateway must be known and available to 3D Systems' 3D Systems Field Service Engineer or authorized reseller at the time of its installation, and should also be known by personnel installing the client software.
  • Page 9: Material Bottle Disposal

    Refer to the VisiJet® materials' MSDS sheets prior to shipment of the ProJet™ Production Modeling System. Discuss your organization's methods for disposing or recycling of such material with your facilities manager, or for more information, contact 3D Systems' Customer Support Hotline 05.9 Weights and Measures...
  • Page 10: Humidity

    CAUTION: IF AT ANY TIME THE "UNCRATED" ProJet™ Production Printing System is to be moved a forklift must be used, ALWAYS contact a 3D Systems' CSE PRIOR TO THE MOVE. Exercise care in moving the machine, physical shock should be avoided. 3D Systems accepts no responsibility for any damage to the machine, repairs that may result from accidental damage to the printer.
  • Page 11 Material Bottles: The printer has up to four material delivery modules for build materials and up to four material delivery modules for support materials. The support delivery modules are located on the left side and the build is located on the right side of the printer.
  • Page 12: Limitation Of Liability

    3D Systems is not, in any event, liable for any damages, including lost profits, cost of cover, or other special, incidental, consequential, or indirect damages arising from the use of this document, however caused and on any theory of liability. This limitation will apply even if 3D Systems or an authorized dealer or representative has been otherwise advised of the possibility of such damage.
  • Page 13: Printer Advance Preparation Checklist

    STAPLE CARD HERE 12.0 Printer Advance Preparation Checklist NOTE: Unless governed by prior arrangement, 3D Systems is not responsible for loading the Projet™ client software on the user's workstation(s). Thus, BEFORE THE PRINTER ARRIVES, ensure that your workstation is capable of supporting the requirements of both the client software and communication with the machine via your network.
  • Page 14 ProJet™ Facility Requirements Guide. Once the printer is installed, we agree not to alter any requirements without consulting with 3D Systems' Customer Service Representative. If alteration are made without consulting 3D Systems, it may void the system's warranty. Customer Signature...

Table of Contents