Emerson Rosemount 5900 Reference Manual page 50

Radar level gauge
Table of Contents

Advertisement

Rosemount 5900 Series
Antenna Feeder
3-26
Preliminary
Nut
TANK
Tank center
Cross hairs
8. Put the gauge on the antenna feeder.
Ensure that the guide pin inside the
base of the transmitter head fits the
groove on the antenna feeder.
9. Tighten the nut that connects the
transmitter head to the antenna.
Finger Nut
10. Loosen the finger nut slightly.
11. Rotate the gauge so that the cross
hairs on top of the 5900 head is
directed towards the center of the
tank.
Reference Manual
300520EN, Rev AA
November 2009
Section 3. Installation

Advertisement

Table of Contents
loading

Table of Contents