4 Push "SIGNAL SELECTOR" to "ON" (auto mode).
The generator is ready for start by remote signal when inverter/charger joint the 2
signal contact.
After connect generator definitively with the inverter/charger you can simulate a
start/stop maneuver. Joint the signal contact and keep joint, generator start the
start up process according pint 9.3 of this manual.
After 5 minutes running you can separate the signal contact, the generator stops
and keep waiting for next order.
If you have some doubts, please contact with us
sat@sg-group.es
30
Need help?
Do you have a question about the 2013022 and is the answer not in the manual?