Notes On Installation And Operation; Important Notes - Bosch Greenstar combi 100 p Installation And Service Instructions For Contractors

Residential gas condensing boiler
Hide thumbs Also See for Greenstar combi 100 p:
Table of Contents

Advertisement

6

Notes on installation and operation

DANGER:
Explosion!
▶ Close the gas cock prior to working on the gas train.
▶ Check for gas leaks after carrying out work on the gas train.
Installation, power connection, connection on the gas and flue gas side
and commissioning must only be carried out by a contractor certified for
such work by the state or local jurisdiction or the local gas or power
utility.
6.1
Notes on installation and operation
When installing and operating the heating system observe the following:
• The elevation of the installation location above sea level must be
taken into account ( Chapter 11.2).
• Follow all local building regulations regarding the installation
conditions on site.
• The local building regulations regarding air supply and venting
systems and the chimney flue connection.
• Electrical code requirements for connection to the electrical power
supply.
• The technical regulations of the gas company regarding the
connection of the gas burner to the local gas main.
• The regulations and standards relating to the DHW heating system.
6.1.1

Important notes

Fill and make-up water for the heating system
Unsuitable fill and make-up water can result in the heating system scaling
up or failing prematurely.
Recommended steps for commissioning a new or retrofit boiler
installation
▶ Flush the system with clean water.
▶ Isolate the boiler, fill the system with fresh water and a boiler cleaner,
run for 30 minutes to 1 hour. Under no circumstances may boiler
cleaner be pumped through the boiler.
▶ Thoroughly flush the system with fresh water. Ensure all zones and
loops are flushed.
▶ Empty out sediment traps.
▶ Systems containing antifreeze not approved by Bosch, must be
completely flushed to ensure no old fluid remains.
▶ Fill the system with fresh water and the proper amount of inhibitor.
▶ Verify the pH is within the proper range.
▶ Add additional inhibitor if pH is not within the proper range.
▶ Check pH annually.
▶ If using antifreeze, fill with approved antifreeze and fresh water.
▶ Always follow the cleaner, antifreeze, or additive manufacturer's
instructions.
▶ Do not mix different manufacturer's products
▶ Follow manufacturer's data to determine the anti-freeze ratio for the
desired freeze protection temperature.
Greenstar combi 100 p / 151 p
Notes on installation and operation | 19
Recirculation pump/DHW recirculation lines
A recirculation pump can be installed. Control and electrical connection
are not possible via the appliance's electronics. Additional accessories
are required for this.
▶ Connect the DHW circulation line at the cold water inlet as close as
possible to the hydraulics connection plate.
Total length DHW/recirculation
line
33 ft (10 m)
33 - 66 ft (10 - 20 m)
66 - 98 ft (20 - 30 m)
Table 7 Recommended flow rates
You can display the flow rate through the heat exchanger with the service
function 6.d current flow through the turbine ( page 43).
Open vented heating systems
▶ Convert open vented heating systems into closed systems.
Gravity heating systems
▶ Connect the appliance to the existing piping system via a low-loss
header with a sludge separator.
Galvanized radiators or pipes.
To prevent gas formation:
▶ Do not use galvanized radiators or pipes.
Plastic pipework
If using plastic pipework for the heating system (eg.underfloor/radiant
heating), the type of pipe that should be used must be oxygen tight.
Use of a room temperature controller
▶ Do not install thermostatic valves on radiators in the primary room.
Primary-secondary piping or a low loss header
In the case of radiant floor heating, panel radiators, systems with several
heating zones or 3/4" baseboard heating (70 ft (21 m), temperature
difference 20 °F (11 °C), flow rate 4.0 gpm (15.1 L/min) plus the
required supply and return pipes), hydraulic separation of the system is
required, e. g. by means of a low-loss header.
Anti-freeze
NOTICE:
Insufficient antifreeze can accelerate corrosion.
▶ Follow manufacturer's instructions on antifreeze concentration.
▶ Frost protection level has to be checked annually during the regular
scheduled maintenance of the condensing boiler.
NOTICE:
System damage!
▶ It is the installer's responsibility to ensure that the heating system is
compatible with the boiler type and size installed.
▶ pH-value of the heating water to be kept between 7 and 8.5.
Flow rate
0.66 gpm (2.5 l/min)
0.92 gpm (3.5 l/min)
1.32 gpm (5 l/min)
6720872361 (2017/04)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar combi 151 pZwb42-3a seriesZwb28-3a series

Table of Contents