Bosch Greenstar combi 100 p Installation And Service Instructions For Contractors page 18

Residential gas condensing boiler
Hide thumbs Also See for Greenstar combi 100 p:
Table of Contents

Advertisement

18 | Examples of Installations
120/230 V AC
120/
PZ1
230VAC
N L
N
3
120 V AC
4
2
N
L
Fig. 9
Wiring
[1]
PCB in wall-mounted gas condensing boiler
[2]
120 V AC mains power (white plug) ( Chapter 7.3, page 34)
[3]
120 V AC, 60 Hz
[4]
Pump heating zone 1
[5]
Pump heating zone 2
[6]
Pump heating zone 3
[7]
External system supply temperature sensor for system supply
pipe
[8]
Outdoor temperature sensor
[9]
LWCO (Low Water Cut Off, 24V AC Transformer required)
[10] DHW temperature sensor (inside gas condensing boiler)
[11] Optionally connect external system supply temperature sensor
for system supply pipe here (with white plug)
For all accessories not included in the package please refer to the Bosch
Product Catalog.
6720872361 (2017/04)
CZM100
4 5 6
3
1
2
3
4
2
1
0
≤ 24 V
≤ 24 V
VZ1
VZ2
VZ3
T0
1 2
1 2
3 4
1 2
3 4
1 2
3 4
≤ 24 V
PZ2
PZ3
BUS
BUS
BUS BUS
L
N L
N L
1 2
1 2
1 2 1 2
7
5
6
L
LS NS
N
1
24VAC
1 2
B
B
4
2
8
F
A
10
CRC200
CRC100
CRC100
HC1
HC3
HC2
9
11
0010011809-002
Greenstar combi 100 p / 151 p

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar combi 151 pZwb42-3a seriesZwb28-3a series

Table of Contents