Installation At A Glance - Cisco ASR 5000 series Installation And Administration Manual

Aggregation services router
Hide thumbs Also See for ASR 5000 series:
Table of Contents

Advertisement

▀ Installation at a Glance

Installation at a Glance
The list below summarizes the installation process for the chassis.
Unpack the chassis and cards
Determine which chassis mounting option to use: standard or mid-mount.
Install the chassis into a standard 19-inch equipment rack or telecommunications cabinet.
Install application cards into the front of the chassis.
Install line cards into the rear of the chassi.s
Connect data cables to the line cards.
Connect power cables to the chassis.
Apply power to the chassis.
Verify that the installation was successful.
Once the installation has been validated, you will be directed to the Administration and Configuration Reference that
provides instructions on how to configure the system for operation.
▄ Cisco ASR 5000 Series Aggregation Services Router Installation and Administration Guide
Important:
Unpacking instructions are not provided in this document. Please refer to
document 902-00-0003, Unpacking the Chassis, for information and instructions on this topic.
Installation Procedure Overview
OL-24878-01

Advertisement

Table of Contents
loading

Table of Contents