5.2 PRODUCT SETUP
When testing is in progress, the LEDs are controlled by the test sequence, rather than the protection, control, and monitor-
ing features. However, the LED control mechanism accepts all the changes to LED states generated by the relay and
stores the actual LED states (on or off) in memory. When the test completes, the LEDs reflect the actual state resulting from
relay response during testing. The reset pushbutton will not clear any targets when the LED Test is in progress.
A dedicated FlexLogic operand,
ated, the
LED TEST INITIATED
The entire test procedure is user-controlled. In particular, stage 1 can last as long as necessary, and stages 2 and 3 can be
interrupted. The test responds to the position and rising edges of the control input defined by the
ting. The control pulses must last at least 250 ms to take effect. The following diagram explains how the test is executed.
5
APPLICATION EXAMPLE 1:
Assume one needs to check if any of the LEDs is "burned" through user-programmable pushbutton 1. The following set-
tings should be applied. Configure user-programmable pushbutton 1 by making the following entries in the

PRODUCT SETUP
USER-PROGRAMMABLE PUSHBUTTONS
PUSHBUTTON 1 FUNCTION:
PUSHBTN 1 DROP-OUT TIME:
Configure the LED test to recognize user-programmable pushbutton 1 by making the following entries in the

PRODUCT SETUP
USER-PROGRAMMABLE LEDS
LED TEST FUNCTION:
LED TEST CONTROL:
The test will be initiated when the user-programmable pushbutton 1 is pressed. The pushbutton should remain pressed for
as long as the LEDs are being visually inspected. When finished, the pushbutton should be released. The relay will then
automatically start stage 2. At this point forward, test may be aborted by pressing the pushbutton.
5-70
LED TEST IN PROGRESS
event is stored in the event recorder.
READY TO TEST
rising edge of the
control input
Start the software image of
the LEDs
Set the
LED TEST IN PROGRESS
operand
control input is on
STAGE 1
(all LEDs on)
dropping edge of the
control input
Wait 1 second
STAGE 2
(one LED on at a time)
Wait 1 second
STAGE 3
(one LED off at a time)
Figure 5–10: LED TEST SEQUENCE
"Self-reset"
"0.10 s"
LED TEST
"Enabled"
"
"
PUSHBUTTON 1 ON
F60 Feeder Protection System
, is set for the duration of the test. When the test sequence is initi-
Reset the
LED TEST IN PROGRESS
operand
Restore the LED states
from the software image
time-out
(1 minute)
rising edge of the
control input
rising edge of the
control input
rising edge of the
control input
rising edge
of the control
input
842011A1.CDR
menu:
USER PUSHBUTTON 1
menu:
5 SETTINGS
set-
LED TEST CONTROL
SETTINGS
SETTINGS
GE Multilin

Advertisement

Table of Contents
loading

Table of Contents