4-2-10 Motor Loading, Gear Loading
4-2-10 (A) Disassembly
1. Remove 2 screw Œ and the 2 Hooks ´.
2. Lift the Motor Loading Ass'y ˇ to remove.
3. Lift the Gear Loading Ø.
ˇ MOTOR LOADING ASS'Y
´ 2 HOOKS
¨ BOSS
Samsung Electronics
4-2-10 (B) Reassembly
1. Mount the Gear Loading Ø.
2. Mount the Motor Loading Ass'y ˇ so that the
1 Boss ¨ and 2 Hooks ´ of the Motor-Loading
Ass'y ˇ are inserted into the Main Base.
3. Secure 2 screw Œ .
Fig. 4-19 Motor Loading, Gear Loading
Disassembly and Reassembly
Œ 2 SCREW
Ø GEAR LOADING
ˆ S/W MODE ASS'Y
4-15