Before You Begin; Powering On The Router - Cisco ASR-920-10SZ-PD Installing Manual

Hide thumbs Also See for ASR-920-10SZ-PD:
Table of Contents

Advertisement

Installing the Cisco ASR-920-10SZ-PD Router
This equipment is suitable for installation in Network Telecommunications Facilities and locations where
Note
the NEC applies. The equipment is suitable for installation as part of the Common Bonding Network
(CBN).
Connect the unit only to DC power source that complies with the safety extra-low voltage (SELV)
Warning
requirements in IEC 60950 based safety standards. Statement 1033
The grounding architecture of this product is DC-isolated (DC-I) for DC-powered products. DC-powered
Caution
products have a nominal operating DC voltage of 24V and -48 VDC.

Before You Begin

When powering the router with DC power, you must ensure that DC power can be conveniently removed
from the unit. The power should not be removed by disconnecting the DC power connector on the unit.
Procedure
SUMMARY STEPS
1. Fix the connector side to the router.
2. Ensure that the notch on the connector is aligned with the contact socket on the cable. See Four-pin Power
Connector figure .
3. Tighten coupling nut fully so that the connector is fastened to the router.
DETAILED STEPS
Step 1
Fix the connector side to the router.
Step 2
Ensure that the notch on the connector is aligned with the contact socket on the cable. See Four-pin Power Connector
figure .
Step 3
Tighten coupling nut fully so that the connector is fastened to the router.

Powering On the Router

After the router is rack mounted, perform these tasks to complete the installation:
• Power on the router.
• Connect the front-panel ports. See the Connecting to SFP Modules section, to complete the installation.
Cisco ASR 920-10SZ-PD Aggregation Services Router Hardware Installation Guide
Before You Begin
11