Horizontal Venting; Vertical Venting - Maytag *TC Installation Instructions Manual

Two-stage condensing gas furnaces with fixed & variable speed blowers - 95.1 % afue
Table of Contents

Advertisement

HORIZONTAL VENTING

(2-Pipe Shown)
90°
Elbow
COMBUSTION AIR
See Table 2 for PVC Pipe
Lengths (Field Supplied)

VERTICAL VENTING

(2-Pipe Shown)
Support System on
Vertical Rise
See Table 2 for PVC Pipe
Lengths (Field Supplied)
Couplings with 2
Hose Clamps (Optional)
46
Straps or Other Suitable
Supports at minimum of 5 ft. Intervals
90° Elbow
First support placed as close
to furnace connection as possible
PVC TEE, Reducer,
and 1/2" x 1/2" Hose Barb
First Support as Close
to Furnace as Possible
PVC TEE, Reducer,
and 1/2" x 1/2" Hose Barb
Figure 37. Horizontal and Vertical Venting
Upward Pitch - 1/4" per foot
(Flue Pipe)
Support System on
COMBUSTION AIR
90° Elbow
(both ends)
See Table 2 for PVC Pipe
Lengths (Field Supplied)
Seal/Caulk
Around Pipes
at Building
90°
Elbow
12" Min.
7"
Wall
Normal
Snow Level
Vertical Rise

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

*tl

Table of Contents