Maytag *TC Installation Instructions Manual page 49

Two-stage condensing gas furnaces with fixed & variable speed blowers - 95.1 % afue
Table of Contents

Advertisement

DOWNFLOW - 1 PIPE OPTIONS
COMBUSTION
AIR
Option
9
See VIEW E for drain line positions
VIEW -E-
Inline Drain
NOTES:
1.) All drain lines must be trapped with J-Trap or field supplied loop.
2.) Drain line traps may be positioned inside or outside the cabinet.
3.)
Inline drain tubing may need to be cut to length to resemble illustration.
DOWNFLOW - 2 PIPE OPTIONS
Flange
Plug
Option
12
See VIEW E for drain line positions
Rubber
Grommet
PVC TEE,
Reducer, &
1/2" x 1/2"
Option
Hose Barb
Rubber
Grommet
See VIEW F for drain line positions
Inline Drain
Drain line attached to
1/2" x 1/2" hose barb
Header box drain tubing is routed thru
the blower deck and side of cabinet.
Rubber
Grommet
Option
PVC TEE,
Reducer, &
1/2" x 1/2"
Hose Barb
See VIEW F for drain line positions
Figure 40. Downfl ow Options
COMBUSTION
AIR
PVC TEE,
10
Reducer, &
1/2" x 1/2"
Hose Barb
VIEW -F-
Drain line
attached to
1/2" x 1/2"
hose barb
Inline Drain - Tubing is routed thru the
blower deck and side of cabinet.
Flange
PVC TEE,
13
Reducer, &
1/2" x 1/2"
Hose Barb
COMBUSTION
AIR
Option
11
Rubber
Grommet
See VIEW G for drain line positions
VIEW -G-
Header box drain
tubing is routed thru
the blower deck and
side of cabinet.
Plug
Option
14
Rubber
Grommet
See VIEW G for drain line positions
Flange
49

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

*tl

Table of Contents