Pressure Switch Tubing - Maytag *TC Installation Instructions Manual

Two-stage condensing gas furnaces with fixed & variable speed blowers - 95.1 % afue
Table of Contents

Advertisement

Conventional (1 Pipe)
Vent
Upfl ow
Horiz. Right
Right
Option 1
Up
N/A
Option 5
Left
Option 2
Direct Vent (2-pipe)
Vent
Upfl ow
Horiz. Right
Right
Option 3
Up
N/A
Option 7
Left
Option 4
Table 4. Vent and Inducer Blower Options
5
2
1
Figure 14. Inducer Assembly Rotation
7. Remove the cabinet plug (7) from side of furnace and
reinstall in hole on opposite side of cabinet.
8. If applicable, install condensate drain on the in-line
drain assembly. See Figures 38 - 40 (pages 47 - 49).
9. Reconnect the electrical harness (1) to the inducer
assembly (2).
10. Reconnect the inducer assembly ground wire (3) to
the blower deck (4) or door.
11. Verify proper operation as detailed on the furnace
label.

Pressure Switch Tubing

Figure 15 displays the proper routing of pressure switch
tubing for *TC furnaces. All upfl ow / horizontal furnaces
have two pairs of switches. One set is connected to the
static tap on the inducer assembly and the other to the
collector box. Downfl ow (*TL) furnaces require only one
pair of switches to be connected to the inducer's static
tap. See Figure 16.
18
Horiz. Left
Downfl ow
N/A
N/A
Option 9
Option 6
Option 10
N/A
N/A
Option 11
Horiz. Left
Downfl ow
N/A
N/A
Option 12
Option 8
Option 13
N/A
N/A
Option 14
7
6
3
4
Figure 15. Pressure Switch Tubing for
*TC Upfl ow / Horizontal Furnaces
Figure 16. Pressure Switch Tubing
for Downfl ow Furnaces
AIR FLOW
AIR
FLOW

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

*tl

Table of Contents