Boiler Cleaning - Okofen PE 08 Operating Manual

Initial start up pellet heating system with auger delivery system or vacuum suction system for professionals
Table of Contents

Advertisement

Boiler cleaning

121
1 1 3 3 . . 1 1 4 4 . . 8 8 B B o o i i l l e e r r c c l l e e a a n n i i n n g g
The value to be set is the time (full hour) at which the boiler cleaning sequence is
performed. On vacuum systems the hopper is also filled at the same time, regard-
less of whether it is empty or not.
You can set in Cleaning/Filling a second cleaning sequence. The value to be set is
the time (full hour) at which the additonal boiler cleaning sequence is performed.
Example: 20h = additional boiler cleaning sequence performed at 20:00. On va-
cuum systems the hopper is also filled at the same time, regardless of whether it is
empty or not.
Default value -1h: It is not performed a second cleaning sequence.
Min Run Time of the boiler until next cleaning sequence. Value adjustable.
Duration of the boiler cleaning sequence in seconds. Value adjustable.
Back to the menu Pellematic.
Operating Manual PELLEMATIC® PE(S)(K)(B) 10 — 56

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Okofen PE 08

Table of Contents