The installation and initial adjustments should be carried out by a qualified and competent technician. Hydor Limited should be consulted before substituting or fitting parts from another manufacturer. It is the responsibility of the installer to verify that the installation is in accordance with the following standards and the owner is given the current User’s Manual.
Page 2
Ensure that the impeller is free to rotate. HV1000 400-3-50 0750 st.st 2.2 If there are any queries concerning the fan unit, HYDOR should be HV1250 400-3-50 1,100 2.89 st.st contacted prior to installation. air space, in front and behind the fan. A minimum of 2 metres is required.
Page 3
3.2 At initial start-up, check that the impeller rotation and airflow direction is correct. 3.3 Check that the motor amperage does not exceed the nameplate rating at full speed and the electrical switch-gear is correctly sized using Hydor technical information. Fan Maintenance 4.1 Inspection of the fan unit at least every 6 months is recommended to...
Page 5
Guarantee Hydor or its agents will, within a period of one year from the date of dispatch from their works, at its option, replace any goods, which are proven to have defects as a result of defective materials or workmanship. The goods must be inspected by a Hydor official and if necessary returned, with a Returns Note Number, carriage paid, for further examination.
Need help?
Do you have a question about the HV800 and is the answer not in the manual?
Questions and answers