Locations For The Cable Cutouts And Rubber; Dimensions Are In Millimeters (Inches) - IBM DS8800 Introduction And Planning Manual

System storage
Table of Contents

Advertisement

Figure 24. Locations for the cable cutouts and rubber bushing holes in the raised floor and
the eyebolt installation on the concrete floor. The pattern repeats for up to five models.

Dimensions are in millimeters (inches).

2. Obtain four fasteners that are heavy duty concrete or slab floor eyebolts. These
156
Introduction and Planning Guide
147.0 (5.8)
457.0 (18.0)
Raised floor
cable cutout
Holes in raised floor
and locations of eyebolts
on concrete floor
Frame front
40.0 (1.6)
751.0 (29.6)
eyebolts are used to secure the Earthquake Resistance Kit. Work with your
consultant or structural engineer to determine the correct eyebolts to use, but
each eyebolt must meet the following specifications:
v Each eyebolt must withstand 3600 lb pull force.
v The dimensions of the eyebolt must allow the turnbuckle lower jaw of the kit
to fit over the eyebolt ( 1 on Figure 25 on page 157) and allow the spacer of
Earthquake Resistance Kit to fit inside the eye ( 2 on Figure 25 on page
157).
Raised floor
cable cutout
Holes in raised floor
and locations of eyebolts
on concrete floor
Frame front
Raised floor hole diameter
131.0 (5.2)
49.4 (1.95)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ds8700

Table of Contents