Installation Checklist; Schematic Diagram; Parts Supplied; Compatible Transducers - Raymarine i70 Installation & Operation Instructions

Instrument display
Table of Contents

Advertisement

3.1 Installation checklist

Installation includes the following activities:
Installation Task
1
Plan your system.
2
Obtain all required equipment and tools.
3
Site all equipment.
4
Route all cables.
5
Drill cable and mounting holes.
6
Make all connections into equipment.
7
Secure all equipment in place.
8
Power on and test the system.

Schematic diagram

A schematic diagram is an essential part of planning
any installation. It is also useful for any future
additions or maintenance of the system. The
diagram should include:
• Location of all components.
• Connectors, cable types, routes and lengths.
16

3.2 Parts supplied

The following parts are supplied with your product.
Description
1
i70 Multifunction instrument display
2
Bezel
3
400 mm (15.8 in.) SeaTalkng® Spur Cable
4
Panel seal gasket
5
Suncover
6
Documentation pack
7
SeaTalkng® Blanking plug
8
4 x M3x16 pan head PZ screws
Unpack the unit carefully to prevent damage. Save
the carton and packing in case the unit has to be
returned for service.

Compatible transducers

For a list of compatible transducers please refer to
Chapter 18 Options and
accessories.

Advertisement

Table of Contents
loading

Table of Contents