SMA SUNNY BOY 2000HF-US Installation Manual page 17

Hide thumbs Also See for SUNNY BOY 2000HF-US:
Table of Contents

Advertisement

SMA America, LLC
In order for all inverters in your plant to be detected by your communication device, all inverters must
have the same NetID. To assign a NetID, proceed as follows:
1. Using a screwdriver of switch
the arrow on the right rotary switch (C) to the
required position.
Saving the Bluetooth settings
The Bluetooth settings will first be accepted upon inverter commissioning.
Installation Guide
1
in. (2.5 mm), set
8
Preparations for the RS485-Quick Module
RS485-QM-IA-eng-IUS111610
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs485Sunny boy 2500hf-usSunny boy 3000hf-us

Table of Contents