Installation
7. For each channel, measure the pH in the conditioned sample to check if the pump ratios are
efficient enough to obtain a pH of around 11.0.
8. If necessary, update the ratios of each channel to maintain a final constant pH of 11.0 ± 0.2.
4.4.10 Reference electrode installation
1. Remove the reference
2. Remove the plastic
3. With care, turn the bottom
4. Remove the plastic plug
54
sensor from its box.
reservoir from the bottom
(the storage solution is
KCl 3M) and install the
O-ring as shown.
electrolyte tube ferrule
with a maximum ¼ turn to
lock it.
on the entry port.