Safety; Responsibilities Of The Operator - Bosch BPT-S 5 Hybrid Installation Manual

Solar inverter with integrated battery
Hide thumbs Also See for BPT-S 5 Hybrid:
Table of Contents

Advertisement

Available languages

Available languages

English
Bosch Power Tec GmbH
2

Safety

2.1

Responsibilities of the operator

The operator must ensure that:
the specified safety equipment for the photovoltaic
system is fully functional
any illegible warning and safety decals on the device
are replaced immediately
there are no easily flammable items stored near the
device
the device is not covered
the device is only placed on surfaces strong enough
to support it
transport, assembly, installation and commissioning
of the device are only carried out by authorised
specialist personnel
transport, assembly, installation and commissioning
of the device are only carried out under the
specified conditions
the personnel commissioned with performing the
work are able to evaluate their assigned tasks and
recognise possible risks
only authorised and trained electricians carry out
installation and commissioning, and change settings
and connections on the device
before installation and operation, any potential
sources of danger are highlighted and the necessary
safety measures are in put place
the manual and, in particular, safety instructions are
read and understood by personnel commissioned
with performing tasks
the instruction manual is available during transport,
assembly, installation and commissioning
the instruction manual is stored in the document
compartment on the device
Safety | 13
Storage system | Installation manual